Two cyclists near the Col de la Croix in summer
BVB Train view - Villars - Winter

Closure of route de Bretaye - Basset/Golf sector

From October 22, 2024 to October 24, 2024, all traffic, including pedestrians, cyclists and baby carriages, will be prohibited. The operation may be postponed in the event of bad weather.

Traffic restrictions Arveyes - Barboleuse

Due to work to install the structure of the future bridge, the section of the Route Cantonale between Arveyes (La Clairière) and Barboleuse will be closed to all traffic from 10.00 pm on Sunday, October 20, 2024 to 5.00 am on Sunday, October 27, 2024.

Official opening of the Col de la Croix road

The Col de la Croix road, linking Villars to Les Diablerets, is opened for the summer season from Wednesday 8th May 2024 at 12 o'clock.

Work on the RC719 road between Villars and Barboleuse

Traffic will continue to flow on an alternating basis through traffic lights until November 2024. During the winter season, the construction site will be at a standstill, allowing normal traffic to flow in both directions for road and rail. More information

The high-altitude roads

The high-altitude roads (Pont-de-Nant, Solalex, Torneresses-Les Pars, Javerne) are open to traffic from Wednesday 1 May. Naturally, caution is still called for!

EXTERNAL_SPLITTING_BEGIN EXTERNAL_SPLITTING_END